

The project for phase 2 was to change the slope of the landscape so that water flows away from the auditorium rather than towards it. With all of that dirt the men built up an embankment and put in a beautiful retaining wall to hold it all together. Building the wall not only required strength (lifting 60 pound blocks) but brains (making sure it all fit together properly).
Another crew spent the day chipping and chopping up a couple of trees that had been cut down because they were a hazard to cars parked in the lot behind the church.
A big thanks goes out to Tim Smith who has been coordinating this whole project, and his wife Lori who provided lunch for the whole crew! Thanks again to all who helped!
No comments:
Post a Comment